2026-09-14 21:04:26Monday turned out to be productive and full of work tasks. We delivered the missing materials — today we received 15 tons of gravel and sand. This allowed us to continue the preparation of the site and move on to the next important stage of work. We carried out all the necessary preparatory work: we compacted the site to the required level, cut off the excess part of the partition base and made accurate markings for the subsequent pouring of concrete. Each stage of preparation is important, since the further result depends on the quality of the work performed. Therefore, before pouring concrete, we carefully check the base and bring the site to the required condition. An important stage awaits us tomorrow — we begin pouring concrete. When performing these works, it is necessary to observe the technology and the correct sequence so that the concrete turns out to be durable and does not crack over time. The work continues. Follow the updates in our blog — we will show the further progress of work.